Peakhour windows11/19/2023 Must include at least one hour during the morning commute hours and one during evening commute hours, Monday through Friday. Peak Hours or “Peak Period” means the period with the highest ridership during the entire transit service day as determined by the transit operator. On-Peak Hours means Hour Ending (“HE”) 0800 through HE 2300 EPT, Monday through Friday, excluding Saturday, Sunday and PJM holidays. The TA estimated that the proposed development would generate, overall, 33 vehicular trips in the AM peak hour and a total of 38 trips in the PM peak hour which would giverise to 295 additional trips over a 24 hour period.Ĭlock hour means either of the following: The remaining 3,500 square feet of space of Building “B” shall be occupied by office use or low impact retail use not to exceed the traffic impact established for office use (58 new total daily trips, 7 new AM peak hour trips and 9 PM peak hour trips) in accordance with the Traffic Impact and Access Study prepared by WorldTech Engineering dated July 2021. The construction phase is calculated to generate 142 daily trips with 56 AM peak hour trips and 57 PM peak hour trips. Residential with retail use-for AM peak hour, use the smaller of 5.0% residential or 5.0% retail trips generated for PM peak hour, use the smaller of 10% residential or 10% retail trips generated for 24-hour traffic, use the smaller of 15% residential or 15% retail trips generated. The construction and delivery traffic associated with a transmission line moves along the project corridor as work progresses therefore, an estimate of 240 ADT with 45 AM peak hour trips and 45 PM peak hour trips is for the segment or work area under construction. The applicant shall provide driveway (street intersection) volume data for 24-hours, AM peak hour, PM peak hour, and peak hour of use for weekday and weekend. Residential with retail use - for AM peak hour, use the smaller of 5.0% residential or 5.0% retail trips generated for PM peak hour, use the smaller of 10% residential or 10% retail trips generated for 24-hour traffic, use the smaller of 15% residential or 15% retail trips generated. The expected trip generation of the proposed development including the AM peak hour, the PM peak hour, daily traffic, and other germane periods as may be appropriate, together with appropriate documentation and references. Holdings has not assigned its interest under any Purchase Contract to any Person (other than a Participating Entity). The model also generates traffic forecasts for the A.M.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |